Industry application

Construction and engineering site inspections

Supervisors most often encounterRisks change rapidly every day, and it is difficult to track photos, locations, and improvement responsibilities if they are scattered

Record construction safety and environmental conditions by region on a daily basis. EZROUND keeps attendance, inspection, exceptions, replacement parts and approval in the same record, saving supervisors one round of questioning.

A REAL WORKING ROUND

What the supervisor really needs,
There is evidence every step of the way.

No need to ask if anyone has arrived

Arrange the route based on scaffolding, openings, material areas, temporary power supplies, and entry and exit routes, and leave personnel, location, and time after arrival.

No need to wait for the paper to discover missing items

Complete the form one by one when you get to the point. If the required content is insufficient, fill it in on site.

Exception handling no longer relies on group chasing

If there is something missing on site, take a photo and note the location. After improvements are made, it will be replenished. The same record will be used for subsequent replacements and approvals.

CHECKLIST EXAMPLE

Let’s make the standards clear first.
Everyone will not do their own thing when they take over the shift.

Projects can be adjusted based on on-site equipment, systems and division of responsibilities. Before official use, the administrator shall confirm the content, judgment standards and completion conditions.

  • ✓guardrail
  • ✓Anti-fall
  • ✓mark
  • ✓stack
  • ✓electricity consumption
  • ✓personal protective equipment
HOW IT RUNS

From arrival to sign-off,
You can review every step.

01

Leave evidence of presence

Go to the scene according to the task route, sense NFC or scan QR to record the person, location and time.

02

Completed according to standards

Complete the check according to the form, leaving the values, results and necessary remarks.

03

Immediately report any abnormality

Put photos, locations and unusual items in the same record.

04

Supervisor takes over

The supervisor will approve or state the reasons for returning the replacement parts, and keep the processing process.

First pick a problem field,
Get started for free.

All functions of EZROUND are free to use. Get started directly after downloading, or tell us the tasks that take you the most time to ask, and we will receive free assistance from dedicated personnel.